grounding of the Statshield

欧美成人免费电影,国产欧美一区二区三区精品酒店,精品国产a毛片,色网在线免费观看

參數資料
型號: 73650
廠商: Desco
文件頁數: 3/4頁
文件大小: 0K
描述: COAT LAB W/CUFFS TEAL XSMALL
標準包裝: 1
系列: Statshield®
服裝類型: 實驗室罩衣,帶腕帶
尺寸: XSmall
材質: 聚酯
顏色: 青色
特點: 胯部帶 4mm 卡釘,袖口帶導電織物
Installation
Follow the directions below for proper installation and
grounding of the Statshield smock.
1. Put on the smock and fasten all of the snaps on the front
of the smock, making sure that clothing is not exposed
outside of the smock.
2. Throughout use, it is essential that conductive cuff (or the
wristband) be in contact with operator’s skin; the
conductive cuff (or the wristband) should never be
allowed to be pulled up and over shirt sleeve.
3. Install a coil cord to the snap stud located above the left
hand hip pocket. Connect the other end of the coil cord
to a verified ground point or continuous monitor.
Grounding Integrity Testing
For daily testing or continuous monitoring of the grounding
integrity of Statshield smocks and ground cords, we
recommend testing the smock while worn and the use of
a standard wrist strap testers or single-wire workstation
continuous monitors. Panel-to-panel conductivity is essential
so as not to leave portions of the smock as isolated charged
conductors. Panel-to-panel conductivity is easy to test using
our Surface Resistance Meter Kit Item #
19787. Place the
two five-pound electrodes on different panels to test. Unless
properly grounded, the smocks can hold a charge and
become a possible source for discharge to ESD sensitive
items. For additional information, refer to ANSI/ESD S20.20,
ESD TR20.20, ESD TR53 and the Garment Standard,
ANSI/ESD STM2.1. Desco has several testers available
for this purpose. For more information ask for specification
drawings or operating instruction manuals by item number.
TB-2055 Page 3 of 4
2013 DESCO INDUSTRIES INC.
Employee Owned
DESCO WEST
- 3651 Walnut Avenue, Chino, CA 91710 (909) 627-8178
DESCO EAST
- One Colgate Way, Canton, MA 02021-1407 (781) 821-8370 Web Site: Desco.com
Figure 5. Testing and monitoring of smock and ground
cord assembly
YES!
NO!
Figure 3. Proper installation of smock wearer’s body
Figure 4. Grounding the smock
Figure 6. Testers
NOTE: ANSI/ESD S20.20 RECOMMENDS THAT THE
GROUND COIL CORD SELECTED FOR GROUNDING OF
PERSONNEL CONTAIN A BUILT-IN CURRENT LIMITING
1 MEGOHM RESISTOR.
Heat Sealed Patches
It is possible to heat seal patches to our smocks. The patch
should be small and the smock should be tested before and
after application.
相關PDF資料
PDF描述
282836-8 TERM BLOCK 8POS SIDE ENTRY 5MM
964201-4 STD-TIMER CONTACT
282837-8 TERM BLOCK RCPT 8POS VERT .200
770520-1 CONN RECEPT 16-20AWG TIN CRIMP
284392-8 TERM BLOCK 8POS SIDE ENT 3.81MM
相關代理商/技術參數
參數描述
736500001 制造商:Molex 功能描述:
73650-0001 制造商:MOLEX 功能描述:HDM BACKPLANE ASSY
736500002 制造商:Molex 功能描述:
73650-0002 制造商:MOLEX 功能描述:HDM BACKPLANE MODULE
736500003 制造商:Molex 功能描述:
主站蜘蛛池模板: 禄丰县| 海伦市| 延寿县| 灯塔市| 翁源县| 通江县| 红桥区| 共和县| 屏东县| 富平县| 密山市| 兴海县| 安丘市| 通渭县| 卫辉市| 榆林市| 丽水市| 时尚| 清流县| 易门县| 凤山市| 临泉县| 柳江县| 宕昌县| 平凉市| 绍兴市| 垦利县| 从化市| 东方市| 青川县| 宜城市| 沾化县| 鹤岗市| 本溪市| 霍州市| 贞丰县| 琼海市| 双辽市| 思茅市| 辉南县| 民勤县|