欧美成人免费电影,国产欧美一区二区三区精品酒店,精品国产a毛片,色网在线免费观看

參數資料
型號: CS2540-9RDDTB1
廠商: POWER-ONE INC
元件分類: 電源模塊
英文描述: 2-OUTPUT DC-DC REG PWR SUPPLY MODULE
封裝: METAL, CASE S02, MODULE
文件頁數: 18/33頁
文件大小: 438K
代理商: CS2540-9RDDTB1
S Series Data Sheet
100 Watt AC-DC and DC-DC Converters
APR 26, 2006 revised to SEP 25, 2006
Page 25 of 33
www.power-one.com
Load
1
2
S+
Vo+
Vo–
S–
Vi+
Vi–
T
Vi+
Vi–
S+
Vo+
Vo–
S–
T
1
Max. 5 converters in parallel connection
11036_012006
Converter
Fig. 29
Paralleling of single-output models using option T with the
sense lines connected at the load
1 Leads should have equal length and cross sections and should
run in the same cable loom.
2 Diodes for redundant operation.
Vo+
Vo–
Vo+
Vo–
Load
Vo+
Vo–
11003_102005
Fig. 28
An example of poor wiring for connections in parallel
(unequal length of load lines)
Option T: Current Sharing
This option ensures that the output currents are
approximately shared between all paralleled converters,
hence increasing system reliability. To use this facility,
simply interconnect the T pins of all converters and make
sure that the reference pins for the T-pin (S- for the S1000
or Vo1– for S2000) are also connected together. The load
lines should have equal length and cross section to ensure
equal voltage drops. Not more than 5 converters should be
connected in parallel. The R-pins should be left in an open-
circuit condition. If not, prior to paralleling the Vo1 outputs
should be individually adjusted within 1 to 2%. Parallel
connection
of
converters
with
option
P
is
not
recommended.
Option P: Potentiometer
The potentiometer allows for an output voltage adjustment
in the range of +10/–60% of Vo nom. It is accessible
through a hole in the front cover. This feature enables
compensation of voltage drops across the connector and
wiring. Option P is not recommended if models are
connected in parallel.
In double-output models both outputs are influenced by the
potentiometer setting. If option P is fitted, the R-pin 16 is
not connected.
Note: If the output voltage is increased above Vo nom via the
R-input control, option P setting, remote sensing, or option T,
the output current(s) should be reduced accordingly so that
Po nom is not exceeded.
Load
Max. 5 converters in parallel connection
+–
Power bus
Vo2–
Vo2+
Vo1–
Vo1+
T
Vo2–
Vo2+
Vo1–
Vo1+
T
Converter
11037_012006
Fig. 30
Paralleling of double output models with the outputs
connected in series, and using option T in an application
with a power bus. Note that the signal at the T-pins is
referenced to Vo1-.
相關PDF資料
PDF描述
CS2540-9RT 2-OUTPUT DC-DC REG PWR SUPPLY MODULE
CS2660-7EPD4T 2-OUTPUT DC-DC REG PWR SUPPLY MODULE
CS2660-7ERD3T 2-OUTPUT DC-DC REG PWR SUPPLY MODULE
CS2660-7PDDB1 2-OUTPUT DC-DC REG PWR SUPPLY MODULE
CS2660-7RD1 2-OUTPUT DC-DC REG PWR SUPPLY MODULE
相關代理商/技術參數
參數描述
CS25-4-2/0 制造商:Thomas & Betts 功能描述:Cable Accessories Exothermic Welding Reusable Graphite Mold Steel
CS2549-000 制造商:TE Connectivity 功能描述:44A0111-18-90-F871 - Cable Rools/Shrink Tubing
CS2550-000 制造商:TE Connectivity 功能描述:44A0111-20-9-F871 - Cable Rools/Shrink Tubing
CS2550AM 制造商:Rochester Electronics LLC 功能描述:- Bulk
CS2552-000 制造商:TE Connectivity 功能描述:44A4121-20-0/9-9-F871 - Cable Rools/Shrink Tubing
主站蜘蛛池模板: 南通市| 镇坪县| 潞城市| 鲜城| 皮山县| 邳州市| 丰镇市| 崇义县| 金沙县| 青河县| 库伦旗| 乳山市| 连江县| 丹东市| 华亭县| 涟水县| 延川县| 枞阳县| 兴山县| 新疆| 商洛市| 黎城县| 公安县| 芮城县| 赤水市| 旅游| 昌图县| 建昌县| 梨树县| 佛教| 镇江市| 休宁县| 正蓝旗| 奎屯市| 宁河县| 扶风县| 阆中市| 盐城市| 天峻县| 聂荣县| 忻城县|