欧美成人免费电影,国产欧美一区二区三区精品酒店,精品国产a毛片,色网在线免费观看

參數資料
型號: TPS2390DGKR
廠商: TEXAS INSTRUMENTS INC
元件分類: 電源管理
英文描述: 1-CHANNEL POWER SUPPLY SUPPORT CKT, PDSO8
封裝: GREEN, PLASTIC, MSOP-8
文件頁數: 6/20頁
文件大小: 497K
代理商: TPS2390DGKR
TPS2390
TPS2391
SLUS471D JUNE 2002 REVISED JANUARY 2008
14
www.ti.com
APPLICATION INFORMATION
setting the fault timing capacitor
The fault timeout period is established by the value of the capacitor connected to the FLTTIME pin, CFLT. The
timeout period permits riding out spurious current glitches and surges that may occur during operation of the
system, and prevents indefinite sourcing into faulted loads swapped into a live system. However, to ensure
smooth voltage ramping under all conditions of load capacitance and input supply potential, the minimum
timeout should be set to accommodate these system variables. To do this, a rough estimate of the maximum
voltage ramp time for a completely discharged plug-in card provides a good basis for setting the minimum timer
delay.
Due to the three-phase nature of the load current at turn-on, the load voltage ramp potentially has three distinct
phases ( compare Figures 1 and 2). This profile depends on the relative values of load capacitance, input dc
potential, maximum current limit and other factors. The first two phases are characterized by the two different
slopes of the current ramp; the third phase, if required for bulk capacitance charging, is the constant-current
charging at IMAX. Considering the two current ramp phases to be one period at an average di/dt simplifies
calculation of the required timing capacitor.
For the TPS2390 and TPS2391, the typical duration of the soft-start ramp period, tSS, is given by equation (3).
t
SS + 1183
C
IRAMP
where:
t
SS is the soft-start period in ms, and
C
IRAMP is given in F
During this current ramp period, the load voltage magnitude which is attained is estimated by equation (4).
V
LSS +
i
AVG
2
C
L
C
IRAMP
100
R
SENSE
t
SS
2
where:
V
LSS is the load voltage reached during soft-start,
i
AVG is 3.38 A for the TPS2390 and TPS2391,
C
L is the amount of the load capacitance, and
t
SS is the soft-start period, in seconds
The quantity iAVG in equation (4) is a weighted average of the two charge currents applied to CIRAMP during
turn-on, considering the typical output values.
(3)
(4)
相關PDF資料
PDF描述
TPS2390DGKRG4 1-CHANNEL POWER SUPPLY SUPPORT CKT, PDSO8
TPS2391DGKRG4 1-CHANNEL POWER SUPPLY SUPPORT CKT, PDSO8
TPS2390DGK 1-CHANNEL POWER SUPPLY SUPPORT CKT, PDSO8
TPS2393APWRG4 1-CHANNEL POWER SUPPLY SUPPORT CKT, PDSO14
TPS2421-1DDAR 1-CHANNEL POWER SUPPLY SUPPORT CKT, PDSO8
相關代理商/技術參數
參數描述
TPS2390DGKRG4 功能描述:熱插拔功率分布 Simple-48V Hot Swap Controller RoHS:否 制造商:Texas Instruments 產品:Controllers & Switches 電流限制: 電源電壓-最大:7 V 電源電壓-最小:- 0.3 V 工作溫度范圍: 功率耗散: 安裝風格:SMD/SMT 封裝 / 箱體:MSOP-8 封裝:Tube
TPS2390EVM 功能描述:電源管理IC開發工具 Simple -48V Hot Swap Contr EVM RoHS:否 制造商:Maxim Integrated 產品:Evaluation Kits 類型:Battery Management 工具用于評估:MAX17710GB 輸入電壓: 輸出電壓:1.8 V
TPS2391DGK 功能描述:熱插拔功率分布 Simple-48V Hot Swap Controller RoHS:否 制造商:Texas Instruments 產品:Controllers & Switches 電流限制: 電源電壓-最大:7 V 電源電壓-最小:- 0.3 V 工作溫度范圍: 功率耗散: 安裝風格:SMD/SMT 封裝 / 箱體:MSOP-8 封裝:Tube
TPS2391DGKG4 功能描述:熱插拔功率分布 Simple-48V Hot Swap Controller RoHS:否 制造商:Texas Instruments 產品:Controllers & Switches 電流限制: 電源電壓-最大:7 V 電源電壓-最小:- 0.3 V 工作溫度范圍: 功率耗散: 安裝風格:SMD/SMT 封裝 / 箱體:MSOP-8 封裝:Tube
TPS2391DGKR 功能描述:熱插拔功率分布 Simple-48V Hot Swap Controller RoHS:否 制造商:Texas Instruments 產品:Controllers & Switches 電流限制: 電源電壓-最大:7 V 電源電壓-最小:- 0.3 V 工作溫度范圍: 功率耗散: 安裝風格:SMD/SMT 封裝 / 箱體:MSOP-8 封裝:Tube
主站蜘蛛池模板: 喀喇沁旗| 霞浦县| 内黄县| 黑山县| 宜春市| 武胜县| 南岸区| 三门峡市| 自贡市| 平和县| 金乡县| 兴山县| 调兵山市| 读书| 正安县| 佛冈县| 乌拉特前旗| 沂水县| 天津市| 当阳市| 洛隆县| 抚松县| 云龙县| 津南区| 东山县| 湘乡市| 旺苍县| 和硕县| 宝坻区| 乳源| 高雄县| 舒兰市| 赞皇县| 社会| 马山县| 白山市| 教育| 张掖市| 三原县| 綦江县| 玉龙|